Wow!  My brain is smoking.  I have been thinking about and planning a schedule for boat maintenance and the installation of all the additional equipment that we will be adding when we take possession in June.  Sometimes it can get mind-boggling…….in addition to being expensive.

Here is a list of things we need/want to install or have installed before we being serious cruising:

bimini top                                                s/s marine grill
diesel marine generator*                        watermaker*
mast mounted radar transmitter              single side band radio*
fax modem for ssb radio                         solar panels atop bimini*
wind generator*                                      false flrs in bilge for storage
additional 110-vlt outlets                         additional 12-vlt outlets
wifi booster/antenna/router                     mattress support/vent

Keeping in mind the above items are just the installations we need to do….this doesn’t count the maintenance things that we have to/need to do prior to pushing off.  *A there are several of the above installations that will take a week to do, so the list is a fairly time consuming one.  (EVERYTHING takes much longer to accomplish than you think it will, especially on a boat……if you think 3 days, add twice that to it.)

I am not by nature a patient person (Dahleen, my wife, can vouch for that).  I WANT to get everything done as quickly (and perfectly) as possible, so we can begin the real adventure of the Bahamas, the Caribbean, and beyond.  We had kinda planned on leaving the Gulf and East Coast of the U.S. for the latter years of our cruising journey when we might need to be closer to home and not able to be doing the off-shore stuff any longer.  So, with that in mind, I had a tentative plan to get as much done as quickly as possible and go to the Bahamas around the first of the year (2015).  After looking at the mounting list of things to do, and after Dahleen pointed out that we don’t really have a deadline, I think we will “go when we get done”.  

We will have the bimini installed in Cleveland before we take the boat to the Chesapeake in June…..we really need it for this 3 plus week-long trip.  Also in June, while enroute to the Chesapeake, I can install the grill and hook up the extra propane tank……and maybe even install the cable and mount for the radar while the mast is down going across the Erie Canal.  I can also replace all the mast mounted lights (anchor light, all around light, deck lights, etc.) with LEDs. 

Once we get to the Chesapeake and put the boat on the hard (out of the water, sitting in a boatyard), I will take care of all the preliminary hole drilling, thru-hull installations, seacock installations, water filter mounting, running hoses, etc., for the genset and the watermaker.  I also have a minor repair to make to the gelcoat on the rudder, and we have to do a complete “bottom job” to get the boat ready for its’ new saltwater environment.  After about a month, we should be ready to launch (splash) from the yard and proceed south to warmer weather….probably to Georgetown or Charleston, SC.  If our friends on Wombat of Sydney are going to be in G’town for the winter, we will go there; if not, we will go to Charleston.  Charleston City Marina is much nicer with lots of things to do and great places to eat, but it’s also more expensive than the Georgetown Marina.  Another positive thing about Charleston vs. Georgetown is……Charleston Harbor is much closer to the ocean than is Georgetown.  It takes us about an hour or more of motoring (up the Pee Dee River?) from the ocean inlet to get to Georgetown vs. about 20 minutes of sailing right into Charleston Harbor.  So, Mike and Lynn are the keys to us choosing Georgetown vs. Charleston.  J

In South Carolina, the plan is to bring the genset and watermaker over from the house in TN and install them there.  We also plan to install the SSB, the solar panels, and the wind generator there.  Mike is a whiz on all things mechanical and he has all these systems on his boat, so I will utilize his expertise if possible.  I am guessing it will take us another month, if all things go as planned.  Once we are through here we will do some family visiting and shove off for Florida.

I think we will spend a week, or so, in the Melbourne area visiting with Dahleen’s parents, and also a friend of mine (Scott) from Afghanistan.  We will continue to move southward, probably going back to the Biscayne Bay/Coconut Grove area for a week, and then either cross to the Bahamas, or travel thru the Keys.

We will have to discuss plans beyond that.  I don’t think we are going to get to spend as much time in the Bahamas (if we even get there) as we want to.  The last time we were there we stayed for 4 months and felt we were rushed.  If that is the case again this time, we may just come back to the East Coast and cruise the Chesapeake and New England states for the summer and try to be back in the Bahamas in late November. 

It’s a lot to think about……and I am sure the “plan” will change multiple times, but so what?  As Dahleen would say, “We have no deadline, right?”